Demolition By Diamond Cutting

DEMOLITION BY DIAMOND CUTTING

DEMOLITION BY DIAMOND CUTTING

MRT PACKAGE C, JAJARAN SG BULOH-KAJANG

PALMA PUTERI CONDOMINIUM, PUTRAJAYA

Reduce existing penthouse parapet wall heights in order to have a better panoramic view.

Method applied must not affect the integrity of existing concrete structure.

The greatest challenge lies on the supporting frame or any temporary work shall not disturb the ground service of residents. 

PENANG TUNGGAL RESERVOIR, SG PETANI

To Make Opening On RC Compartment Wall Inside The Existing Reservoir

WATER CO (FAR EAST) FACTORY AT KAWASAN PERINDUSTRIAN SG. BULOH JAYA, SELANGOR

Fire Damaged Building Demolition Work

The Consultant called to remove the 2 storey fire damaged building with ground slab remained, immediately after the fire occurred. We took 6½ weeks to accomplished the demolition work. Total area removed is approximately 20,300ft².

WATER CO (FAR EAST) FACTORY AT KAWASAN PERINDUSTRIAN SG. BULOH JAYA, SELANGOR

Fire Damaged Building Demolition Work

The Consultant called to remove the 2 storey fire damaged building with ground slab remained, immediately after the fire occurred. We took 6½ weeks to accomplished the demolition work. Total area removed is approximately 20,300ft².

PANTAI DALAM WASTE WATER TREATMENT PLANT

To Make Square Opening by Using Wire Sawing Method

To make 6 nos of square opening with size of 1.2m x 1.2m R.C. wall for installation of M & E services ducting using wire sawing method.

Star-Hill Shopping Complex,
Jalan Bkt Bintang, Kuala Lumpur

Reposition and Upgrading of Existing Metallic Geodesic Dome For

As Star-hill is located at the busiest and most congested street in KL golden triangle zone, therefore works shall carry out in safest & most efficient manner to achieve minimum disturbance to the surrounding. There is no room for slightest error and omission.

Star-Hill Shopping Complex,
Jalan Bkt Bintang, Kuala Lumpur

Reposition and Upgrading of Existing Metallic Geodesic Dome For

As Star-hill is located at the busiest and most congested street in KL golden triangle zone, therefore works shall carry out in safest & most efficient manner to achieve minimum disturbance to the surrounding. There is no room for slightest error and omission.

KTM RAILWAY STATION, SENTUL

To demolish and remove the pedestrian bridge inside Rail Way Station & convert into Sentul Integrated Railway Station.

Due to the heavy flow of the foot traffic, the time allowed for demolition and removal of the existing pedestrian bridge was 16 days only.

Demolition work over the road which may disrupt the traffic are prohibited day time, therefore removal of cut-out panel are carried out during night time.

PETRONAS PENAPISAN (M) SDN BHD,
SG UDANG

To carry out train opening 1.2mx1.2mx7.0m depth on RC deck by diamond wire for installation & upgrading of bar screen system.

Due to the sensitivity and volatility of environment In oil & gas filtration site, All methods applied shall be sparks free.

PETRONAS PENAPISAN (M) SDN BHD, SG UDANG

To carry out train opening 1.2mx1.2mx7.0m depth on RC deck by diamond wire for installation & upgrading of bar screen system.

Due to the sensitivity and volatility of environment In oil & gas filtration site, All methods applied shall be sparks free.